re: Ann: VPE: Growler Oil Field Reserves 3P E... Thanks Slampoil
So effectively there are 3 more channel sand wells to be drilled 2 in this campaign. The 8 overbank wells may not be drilled especially if they only flow 100 bopd. I suppose the poo is whats important.
Having said that I don;t think G1 and G2 would be classed as Channel sand wells. 3,4,5 all have these sands.
- Forums
- ASX - By Stock
- ITC
- Ann: Growler Oil Field Reserves 3P Estimate, PRL
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)