preposterously prosperous
the first stage is nearing its completion
while the first frac on the slotted liner was underway, a second frac crew pulls up ready to go in and set up after the first crew leaves, these crews will do the multistage frac
kowalik
about 48 hours ago
- Forums
- ASX - By Stock
- ADI
- Ann: Sugarloaf Operations Update
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)