STU 0.00% 94.0¢ stuart petroleum limited

+ update: drilling report: arwon #1 sa +

  1. 22,691 Posts.
    DRILLING REPORT: ARWON # 1
    PEL 93, COOPER/EROMANGA BASIN, SA

    Stuart Petroleum advises that some faults with the BOP system were identified whilst pressure testing. These faults will be rectified and retested prior to any
    recommencement of drilling operations.

    The McKinlay formation is the first of the primary objectives at a prognosed depth of 1374 metres.
    The status of Arwon # 1 at 0600 hours (CST) on 30 September 2004 was:
    Location: PEL 93, 55km south-west of Moomba
    Planned Total Depth: 1930 metres
    Current depth: 790 metres

    Operations: Repairing BOP system

    Spud: 02.00hrs, 23 September 2004
    Participants in the Arwon Joint Venture are:
    Stuart Petroleum Limited (Operator) 88.8% (STU)
    Cooper Energy NL 11.2% (COE)
 
watchlist Created with Sketch. Add STU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.