re: + drilling of arwon--countdown + +
http://stocknessmonster.com/news-item?S=STU&E=ASX&N=142372
28 Sept.
Extract: Stuart Petroleum advises the bradenhead was installed and successfully pressure tested. The Blow Out Preventers (BOP’s) have been installed and will be pressure tested prior to running in the hole to commence drilling.
The McKinlay formation is the first of the primary objectives at a prognosed depth of 1374 metres. Drilling is expected to recommence Tuesday afternoon.
The status of Arwon # 1 at 0600 hours (CST) on 28 September 2004 was: Location: PEL 93, 55km south-west of Moomba Planned Total Depth: 1930 metres Current depth: 790 metres
STU Price at posting:
0.0¢ Sentiment: None Disclosure: Held