AGM preso was quite impressive. Cash costs at 50c are almost what you would call low cost.
By my calcs EV is now approx:
$120 m (marcap) -$40m (cash) + $100m (notes) = $180m
cash flow from ops (based on last quarter $3.9 m * 4) = $15.6 million
If zinc prices hold up and they can double production at Endeavour will be looking very cheap - other projects aside.
- Forums
- ASX - By Stock
- CBH
- finally some action.....
finally some action....., page-13
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CBH (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.390M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
CBH (ASX) Chart |
Day chart unavailable