More going on?
http://www.eapc09.org/assets/downloads/OVER%20VIEW.pdf
"Songo Songo gas production is currently at maximum rate of
70mmscf/d being limited by processing facilities.
Plans are underway to expand the processing to 140mmscf/d so that more gas can be shipped to Dar es Salaam for additional power generation, Compressed Natural Gas (CNG) for vehicles,
industries and domestic uses."
- Forums
- ASX - By Stock
- KEY
- interesting... is this what we are waiting for
interesting... is this what we are waiting for, page-8
-
- There are more pages in this discussion • 46 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KEY (ASX) Chart |
Day chart unavailable