Ian, good summary!
Of note, STU says the recoverability factor for the permits down south looks closer to 50%,whilst up north it is around 40% (Tino is an ex-Santos petroleum engineer so he should have a good idea).
In addition, the pipeline from Worrior should be happening by the end of the year-indicative cost range$3-5m. This will significantly lift Worrior(&Arwon?) production rates.
Cheers,TAS