Last week PT Antam Tbk (“Antam”) reported in the Indonesian web site Petromindo.com that Antam is in talks with Oropa Limited (“Oropa”) to increase its interest in the Pungkut gold project, located in North Sumatra, Indonesia. Antam is currently entitled to a 25% interest in PT Sorikmas Mining (“Sorikmas”), the holder of the Pungkut Contract of Work, with the remaining 75% being held by Oropa. In the interests of maintaining an informed market, Oropa wishes to disclose the following: • Antam has recently been undertaking due diligence on the Pungkut project. • Oropa has a strong existing relationship with Antam and has been assisting with the due diligence process. • No offer has been received at this time. In the meantime, work continues on the Scoping Study being undertaken by SRK Consulting (Australasia) Pty Ltd for the ongoing development of the Pungkut project. Final results of that work are expected by mid-October. Yours faithfully, OROPA LIMITED PHILIP C CHRISTIE Director RECENT ASX ANNOUNCEMENTS 22 September 2008 Annual Report For Year Ended 30 June 2008 11 September 2008 PowerPoint Presentation 8 September 2008 Significant Gold Intersections Returned From Sihayo 1 North Indonesia CORPORATE 25 Charles Street South Perth WA 6151 Ph: +61 8 9368 4544 Fax: +61 8 9368 4522 Email: [email protected] Web: www.oropa.com.au ABN: 77 009 241 374 BOARD OF DIRECTORS Brian Hurley Chairman Philip Christie Director Rod Murchison Non-Executive Director Bruce Tomich Non-Executive Director Misha Collins - Non-Executive Director ASX Code: ORP
ORP Price at posting:
4.5¢ Sentiment: Buy Disclosure: Held