Hudson#1 75% Vertical Niobrara Shut in Pathfinder C11-12 #1HZ 75% Horizontal Niobrara Producing (re-worked for 50 bbl oil per day, likely already less than half) Pathfinder #2 75% VerticalGreenhorn Idle Columbus #1* 75% DeviatedPierre Shut in Marco Polo #1* 75% DeviatedPierre Shut in Magellan #1 75% DeviatedPierre Producing Bird 13-18 75% DeviatedPierre Shut in (was getting work done by some contractor, never happened)
I didn't say the frac crew was same. There was no radial well ever attempted as per plan, as far as I'm aware like many announcements from FPL, it just didn't happen.
I know HZ1 is a horizontal and as I said, re-worked for new IP of 50. Will never pay for itself. (with workover, likely a $5m well) These are fracked vertical wells. Vespucci is just 500m away from HZ1