Going by the pre feasibility its going to take a while to ramp up to full production so keep that in mind but we have a new facility and very low industry operating costs
Think C3 costs are around 50c /per lbs? So safe to say we should be banking minimum 50% of revenue. Any increase in copper and zinc prices is just extra cream which is nice considering the mid term outlook.
Imo glta