Having read through the mining plan, it looks sound. Is a single flow multi transformer setup normal for an operarion such as this, or would it be typical to have secondary backup lines to reroute power if it goes out?
History-making uranium sample grades and an imminent drill run. Infini Resources is poised to transform in 2025
ACW This biotech stock raised $11M in a risk-off environment. Its Alzheimer's drug could change the game