Originally posted by ozblue
@The Avenger ........"Looking forward to the WFE timetable and I'm with DeBoss.....Reckon opens up on 3rd Dec.....1 month for all relisting requirements and 1 month for EGM"
That is from a post of yours in September last year, how'd that date work out for you??
Why do you keep making up dates that prove to be overly optimistic??
What you stated back in September was, is and should be the next move by WFE, produce a timetable to resumption of trading.
Well
@ozblue , if you want to bring up previous posts, how did your predictions of cobalt feed for the plant go?
Do you think the 600,000tpa of minimum 1% cobalt feed contracts is enough for you or your still hanging on to your previous sentiment of “ it’s unlikely/impossible “ to get such grades as it’s not just “lying around”?
Its OK to be wrong sometimes, and sorry - you were completely wrong on the cobalt feed grade.
Cheers,
Disco.