I emailed Bruce yesterday about my concern, reentry and pilot plant, and I just got reply from Bruce as following,
As you know I can only provide you with information that has already been released through the ASX.
We are building a pilot plant that will include the Lilac process. We have indicated in our announcements that the design and engineering for the pilot plant is underway.
We have announced that the re-entry program will be conducted in Q1 2019. We remain on schedule.
The pilot plant is not delayed, it is in design and engineering phase. Once that is completed, we will build the pilot plant.
Regards,
Bruce
Bruce answered me very quick, I am very happy with the answer, thanks Bruce.
- Forums
- ASX - By Stock
- ASN
- Good old fireside chat
Good old fireside chat, page-10288
-
-
- There are more pages in this discussion • 1,428 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.4¢ |
Change
0.001(0.79%) |
Mkt cap ! $113.7M |
Open | High | Low | Value | Volume |
6.3¢ | 6.4¢ | 6.1¢ | $92.32K | 1.484M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 88102 | 6.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.4¢ | 32557 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 78748 | 0.090 |
2 | 65436 | 0.089 |
4 | 302344 | 0.088 |
4 | 322102 | 0.087 |
3 | 371806 | 0.086 |
Price($) | Vol. | No. |
---|---|---|
0.093 | 21430 | 2 |
0.095 | 12600 | 1 |
0.096 | 98635 | 5 |
0.097 | 89032 | 3 |
0.098 | 145000 | 1 |
Last trade - 12.31pm 04/12/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |