Except it's not a direct comparison. If TNO and PUR were both to DSO PUR have to dig and concentrate 4-5x more ore than TNO does. It might not be the most intensive part of a full flow sheet but it still costs a lot of money and much higher CAPEX as you need a plant with 4-5x the front end.
Secondly other than the headlines average concentrate grade over full intersections is less than 2% whereas TNO were consistently producing concentrate at above 2% over full intersections.
Finland/Sweden = better sovereign risk prospects. South Africa = cheaper production jurisdiction.
It's not really apples and apples in my opinion.
- Forums
- ASX - By Stock
- PUR
- Ann: Exceptional Vanadium Grades Confirmed at Koitelainen Vosa
Ann: Exceptional Vanadium Grades Confirmed at Koitelainen Vosa, page-39
-
- There are more pages in this discussion • 181 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add PUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.270M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
57 | 58727994 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 11448920 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 211170 | 0.025 |
3 | 274000 | 0.024 |
4 | 1346362 | 0.023 |
3 | 2445000 | 0.022 |
6 | 1690080 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 100000 | 1 |
0.027 | 500000 | 3 |
0.028 | 265829 | 2 |
0.029 | 337994 | 3 |
0.030 | 707095 | 3 |
Last trade - 10.18am 27/11/2024 (20 minute delay) ? |
PUR (ASX) Chart |