    As mick z says, I just used 100,000 tonnes of dump as an example.


    How much might there be in the dumps and slag heap? It is hard to know but one could take a rough guess and say 1.5 - 3 x the tonnage of ore processed. On page 30 of the inferred resource estimate it is stated that 60,000 tonnes of ore were mined. So we're looking at stockpiles of say 90 - 180,000 tonnes.


    The 200,000 tonnes of concentrate is a notional amount, a limiting amount, an amount with which to work out some contract numbers. Using the calcs in my post, if you work back from 200,000 tonnes of concentrate assuming a grade of 22% you end up with...


    100,000 tonnes of dump gave 3,500 tonnes of concentrate therefore for 200,000 tonnes of con:


    tonnes on stockpile = 100,000 / 3,500 x 200,000 = 5,700,000 tonnes grading 1.2% Cu.


    Now I don't know if you've ever seen a 5.7Mt stockpile but, in my opinion, the stockpiles at Cangai are not of that size. They are more likely to be in the range of 90 - 180,000 tonnes, IMBO.


    Think of it another way...if the stockpile tonnage is 5.7M then for every tonne of ore processed in the past about 94 tonnes of other material was mined. I haven't met anyone who was mining back in the days of Cangai but I know an underground gold miner who is the son of an underground tin miner who was the son of an underground tin miner and I do know that digging rock back then was hard work and if it didn't pay it was left in the ground. They tunnelled to the vein (waste) then tunnelled on the vein (waste, low grade and ore) then mined the ore between the tunnels.


    Look at the long section of the inferred resource - those blobs on the section constitute 3.2Mt and some are 20m wide. Tell me where the 5.7Mt came from given that the average mining width was about 3m.

 
watchlist Created with Sketch. Add CCZ (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
-0.001(8.33%)
Mkt cap ! $5.198M
Open High Low Value Volume
1.1¢ 1.2¢ 1.1¢ $13.71K 1.192M

Buyers (Bids)

No. Vol. Price($)
6 2332675 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 894080 3
View Market Depth
Last trade - 15.40pm 02/12/2024 (20 minute delay) ?
CCZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.