Yes makes sense IRC take there the time to really go over the drilling data to date at the likes of Boolara .. it all takes time and I certainly have only scratched the surface on MRP what can seem like a good deal might well not be as tubber makes the point >> I certainly trust IRC mgmt have to have our best S/H interests going forward and will not dilute us by 45% for worthless resources and permits.?
I was interested to see MRP had a trial pit was completed within budget and 30,000 dry tonnes of ore was treated at the FMR Greenfields treatment plant at Coolgardie at a head grade of 1.73 g/t which produced 1,525 oz of gold
Now was this trail pit just a sweet spot ?? or an average location across the project surface
IRC Price at posting:
14.0¢ Sentiment: Buy Disclosure: Held