The Northern Territory has unveiled its first grid-scale battery storage facility, with a 5MW/2.5MWh system unveiled in Alice Springs to improve the integration of solar, and provide support for the new and existing gas generators.
Territory Generation expects that the cost of the battery system is expected to be recouped within four to five years due to efficiencies and fuel and maintenance savings, mostly from having to use less gas generation and less “spinning reserve”.
https://reneweconomy.com.au/teslas-and-victorias-second-big-battery-completed-at-ganawarra-solar-farm-46361/
Ash here.
Yes, this reduces the gas consumed at Alice. PWC will offer the gas saved into the NT and NGP pipes. Twill be minor.
Ash
ps sorry for distracting from the boardroom excitement.
- Forums
- ASX - By Stock
- CTP
- Alice Springs battery installed
Alice Springs battery installed
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.1¢ |
Change
-0.001(1.92%) |
Mkt cap ! $37.74M |
Open | High | Low | Value | Volume |
5.1¢ | 5.1¢ | 5.1¢ | $11.38K | 223.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 60226 | 5.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.2¢ | 140142 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 55500 | 0.135 |
9 | 1167237 | 0.130 |
8 | 593133 | 0.125 |
19 | 902443 | 0.120 |
1 | 86000 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 787079 | 9 |
0.145 | 1062465 | 10 |
0.150 | 344400 | 6 |
0.160 | 125481 | 8 |
0.165 | 497623 | 5 |
Last trade - 15.12pm 27/11/2024 (20 minute delay) ? |
CTP (ASX) Chart |