14D 0.00% 3.8¢ 1414 degrees limited

14D Chart Thread, page-609

  1. 7,114 Posts.
    lightbulb Created with Sketch. 461
    The installation at the Glenelg Wastewater Treatment Plant is the first installation of a 1414 Degrees product at a commercial site.

    The GAS-TESS system will demonstrate its effectiveness by storing energy generated from methane biogas harvested from the SA Water Glenelg Wastewater Treatment Plant.

    It will deliver heat energy for SA Waters’ digesters and electricity for general operations.

    It will also enable time shifting of electrical generation with the aim to assist SA Water in achieving their zero net electricity costs by 2020 target.

    The GAS-TESS device will be transported to the Glenelg Wastewater Treatment Plant from the Company’s Lonsdale workshop in late November 2018.
 
watchlist Created with Sketch. Add 14D (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
0.000(0.00%)
Mkt cap ! $16.67M
Open High Low Value Volume
3.8¢ 3.8¢ 3.8¢ $3.938K 103.6K

Buyers (Bids)

No. Vol. Price($)
1 90000 3.9¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 92615 2
View Market Depth
Last trade - 09.59am 04/12/2024 (20 minute delay) ?
14D (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.