The installation at the Glenelg Wastewater Treatment Plant is the first installation of a 1414 Degrees product at a commercial site.
The GAS-TESS system will demonstrate its effectiveness by storing energy generated from methane biogas harvested from the SA Water Glenelg Wastewater Treatment Plant.
It will deliver heat energy for SA Waters’ digesters and electricity for general operations.
It will also enable time shifting of electrical generation with the aim to assist SA Water in achieving their zero net electricity costs by 2020 target.
The GAS-TESS device will be transported to the Glenelg Wastewater Treatment Plant from the Company’s Lonsdale workshop in late November 2018.
- Forums
- ASX - By Stock
- 14D
- 14D Chart Thread
14D Chart Thread, page-609
-
-
- There are more pages in this discussion • 252 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 14D (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.67M |
Open | High | Low | Value | Volume |
3.8¢ | 3.8¢ | 3.8¢ | $3.938K | 103.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 90000 | 3.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 92615 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 23512 | 0.059 |
1 | 4172 | 0.058 |
3 | 29090 | 0.055 |
1 | 500000 | 0.054 |
2 | 55000 | 0.045 |
Price($) | Vol. | No. |
---|---|---|
0.060 | 258813 | 3 |
0.061 | 9328 | 1 |
0.062 | 120000 | 1 |
0.063 | 2941 | 1 |
0.065 | 8460 | 1 |
Last trade - 09.59am 04/12/2024 (20 minute delay) ? |
Featured News
14D (ASX) Chart |