    Hey gents, sorry for the long winded posts - this announcement has some key information in it, which I have used to update the forecast I made a couple weeks ago...In short, potential +5.34M cash flow based on current forecasts, with lots and lots of potential tail winds if they can continue the ramp up to 2.2Mtpa... 


    Assumptions;

    - $10M raised to buffer the estimated -A$13M cash flow in Sept quarter (-$13M from my post dated 8/10/18)

    - A$230/t coking coal price (9% increase from A$211/t)

    - 0.875Mtpa run rate, "Production is targeting an expected rate of 2,500 tonnes per day" (2500t/day*7days*50weeks = 875kTpa), not 1Mtpa

    - Assume cash costs of A$158/t since the $145/t estimate was for 1Mtpa rate (145 * 1.09 = 158)


    So still forecasting significant negative cash flow, however B2Y only raised A$10M in the placement and right now, they'd know what the quarterly negative cash flow could be (they have to report it in the next 7 days)... So although I have assumed -A$13M this could come in lower...

    875kTpa Case - assuming mine cash cost of A$145/t from the August presentation
    ROM Production: 218.75kT @ A$158/t 
    Cash Cost: A$34.56M
    Met Coal Produced: 158.0kT @ A$230/t 
    Thermal Coal Produced: 27.9kT @ A$127.4/t (USD$93/t and assuming 0.73 exchange rate)
    Total Revenue: $36.35M + $3.55M  (assuming 100% of product sold)
    Cash Flow: +A$5.34M / quarter

    2.2Mtpa Case - assuming mine cash cost of A$100/t from Prospectus (assuming its USD)
    ROM Production: 550kT @ A$100/t
    Cash Cost: A$55.0M
    Met Coal Produced: 397.4kT @ A$211.55/t 
    Thermal Coal Produced: 70.1kT @ A$127.4/t (USD$93/t and assuming 0.73 exchange rate)
    Total Revenue: $84.1M + $8.9M  (assuming 100% of product sold)
    Cash Flow: +A$38M / quarter  --- A$152M for the FY2020, worth the investment PE of 1X but lots of risk between now and then and many hurdles to jump...

 