HTI 0.00% 0.1¢ hydrotech international limited

contract awarded

  1. 9,537 Posts.
    lightbulb Created with Sketch. 64
    Hydrotech has been awarded to install the MPS system into Chongqing-Chendu Expressway Tunnel.
    The contract will be to install across an area of some 108,000 sq meters.
    The average price for a square meter amongst the submission program was AUD$24 per sq meter.
    If AUD $24 is obtained that = approx $2.5 mill.
    Lets hope this is the start of better things to come.
 
watchlist Created with Sketch. Add HTI (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.