In the presentation Mr Loxton outlined that it was important to note that the battery is not being trialed in Western Australia, it is being demonstrated. The battery technology has been trialed and proven in South Korea and has run for 3,000 cycles or the equivalent of 9 years and in multiple sites with electricity grid and solar.
Strategy is for more demonstration sites in Australia with major utility providers.
- Forums
- ASX - By Stock
- POW
- Ann: RIU Resources Investor Roadshow Presentation
Ann: RIU Resources Investor Roadshow Presentation, page-7
-
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POW (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.204M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
POW (ASX) Chart |
Day chart unavailable
The Watchlist
NXD
NEXTED GROUP LIMITED
Nick Poll, Managing Director
Nick Poll
Managing Director
SPONSORED BY The Market Online