“The occasion, to be attended by several prominent figures from the industry and national politics, will also provide space for NEMOS and other companies to showcase demos and provide project updates, the organizers said.”
https://mobile.marineenergy.biz/2018/07/26/ostend-tower-to-light-course-for-marine-energy-research/
The most recent tank testing of a scaled down Ceto 6 was done using NEMOS power take off technology.
The images of the test buoy, appeared to show that the PTO was externally mounted (out of the wave pool).
Movement from the buoy was transferred to the PTO by cables and pulleys, (not dissimilar to how NEMOS’ floating device operates.
As we know, Ceto 6 will have the PTO mounted inside the buoy.
I am wondering if this test tower that NEMOS is building could be used to test a full size Ceto 6 in the same way as the scaled version in the wave pool?
In doing this, CCE could deploy and assess how the buoy functions before moving to the next step using an on board PTO.
In other words, a full scale version of the wave tank test.
View attachment 1222080
View attachment 1222083