Not sure how much more to the East
But IMO would be good if they drill more once the study is done
900 square kilometre area 15 holes drilled and they have found 7 decent intersections•750mm Li
5152•600mm Li 4542•1.3 meters Li 5275•2.35 meters Li 7319•950mm Li 5226-1.55meters Li 7448•1.15meters Li 7510•1meter Li 5641
Would I have loved a first hole and a 130meters intersect Li over 7000 reading? YES!!!
But it’s that realistic? NO!
Let’s see what they say about “Arrangements have been made with the drilling company that the drill rig will remain on site at Turesi Camp until all the data is available for a decision to be made to continue with further drilling.”
GPP Price at posting:
0.5¢ Sentiment: Buy Disclosure: Held