trtkjd1
I don’t recall seeing so much uninformed waffle on any mining thread as I read on this one. Full credit to our armchair expert Vertigo as even he has backed off on in recent times. Stacpooles will not grade (see my previous posts). Others profess knowledge of shaft refurb costs, some speak of readily accessible open cut resources on Morning Star Hill, some refer to infrastructure values of mill, paste plant, headquarters at ridiculous levels. The FACTS are that you are all flying blind and have no knowledge of the precinct or the project. You also have no idea as to capital required and time frame involved in getting an auriferous mine up and running. I, and a select few, have tried to temper the unbridled ramping from those with their heads up their backsides while the share price has been decimated.
Stop posting crap and stick to your day jobs.
AUL Price at posting:
0.7¢ Sentiment: None Disclosure: Not Held