The "from 26m" and "from 44m" refers to the distance from the drill collar - ie the distance down hole from the surface.
This means that the 30m intercept grading 7.09 g/t commenced at a down hole depth of 26m........
Hope this helps your understanding.
I think results are spectacular, but they need more holes in order to get to a JORC compliant resource or reserve.
The company hopes to drill like mad before the wet and pend the wet period punching numbers into a modelling system and try and give us a volume or tonnage and grade number in I think Q3 meaning the September 2018 Quarter.
Cheers,
DDD
OKU Price at posting:
34.5¢ Sentiment: Buy Disclosure: Held