"While attempting an in-seam sidetrack from this wellbore, in order to execute the third lateral for the pilot in preference to returning to Glenaras 11L, the rig encountered drilling problems due to localised stability of the coal approximately 70m into the new sidetrack coal section."
That to me says stucks
- Forums
- ASX - By Stock
- GLL
- Ann: Glenaras Gas Project - Drilling Update
Ann: Glenaras Gas Project - Drilling Update, page-9
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add GLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.757M |
Open | High | Low | Value | Volume |
1.4¢ | 1.4¢ | 1.4¢ | $84 | 6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 124618 | 1.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 1900008 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 799703 | 0.012 |
5 | 644898 | 0.011 |
3 | 600000 | 0.010 |
3 | 611112 | 0.009 |
2 | 185000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 70000 | 1 |
0.014 | 48500 | 1 |
0.016 | 100000 | 1 |
0.018 | 27000 | 1 |
0.019 | 525237 | 3 |
Last trade - 15.57pm 22/11/2024 (20 minute delay) ? |
GLL (ASX) Chart |