AMN 7.41% 14.5¢ agrimin limited

Ann: Pre-Feasibility Study Completed for Mackay SOP Project, page-72

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. pkn
    368 Posts.
    lightbulb Created with Sketch. 2
    So AMN trench length is more than 4x RWDs to produce roughly the same output. Why is that?

    Does RWD plan a 133km trench every 7 years for the life of the project, while AMN has factored in a 550km trench for the life of the project?

    Or is it the fact that lower grade and slower flow require AMN to run a longer trench to achieve a steady state flow to produce the ~430kTa output?

    I think it is the latter, but any thoughts from AMN holders would be appreciated.
 
watchlist Created with Sketch. Add AMN (ASX) to my watchlist
(20min delay)
Last
14.5¢
Change
0.010(7.41%)
Mkt cap ! $60.70M
Open High Low Value Volume
13.5¢ 14.5¢ 13.5¢ $4.941K 35.18K

Buyers (Bids)

No. Vol. Price($)
1 30000 14.0¢
 

Sellers (Offers)

Price($) Vol. No.
16.0¢ 74741 2
View Market Depth
Last trade - 13.05pm 26/11/2024 (20 minute delay) ?
AMN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.