GPP 0.00% 0.1¢ greenpower energy limited

Ann: 26m (down hole thickness) Pegmatite drilled in TD 003, page-5

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 6,289 Posts.
    lightbulb Created with Sketch. 2939
    As I stated in the past, I would prefer spodumene to polylithionite -Post #: 32598439

    Now this Ann is a positive development. The two previous holes hit saprolite clay with no pegmatite stringers to 35 metres, this one did. Then add to that the 26 metres of pegmatite here and I think they might be moving in the right direction to get to the main body (albeit a bit of overburden before you get to that pegmatite). All IMO

    If anyone is interested this was my opinion on hole 1 Post #: 32598031 and then hole 2 Post #: 32688211

    Interesting choice hole 4, they might of been better off targetting a hole to the right of 3 (instead of left, but why not lets see what is there as well).

    Searching for the needle in the haystack, i.e. in terms of the main body of the pegmatite assuming it is there in the current drill area, so lets see what number 4 brings.

    All IMO
 
watchlist Created with Sketch. Add GPP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.