Good news out of this is that there will be some scout drilling of geophysical targets at Rover (NT) starting around July, according to that timeline.
Anyone else have an opinion about why OZL at the Eloise JV are at Jericho seem so keen to drill the J1 conductors before moving onto the J2 and J3 conductors after J1? Not really in MEP's control as OZL are spending the $ and directing where the rigs are going there but I was curious as to why they are going that way.
MEP Price at posting:
8.0¢ Sentiment: Hold Disclosure: Held