GPP 0.00% 0.1¢ greenpower energy limited

Rig at Site Lithium Drilling Turesi, page-20

  1. 1,258 Posts.
    lightbulb Created with Sketch. 78
    My sentiment is buy I look at the full side of the glass your sentiment is none and you look at the empty side of the glass

    It’s a public holiday and the 2 weeks management has been talking about just about reach that time so IMO rig is there or just about there this community week hopefully we’ll know more

    Just 2 points don’t think it can get anymore clearer:

    •23rd March: On 19 January 2018 Greenpower provided the market with an exploration update relating to the Turesi Lithium prospect and associated drilling. Greenpower has been advised by its partner GSM that the drilling rig is in Georgetown, Guyana and that it will be moved to the drill site over the next two weeks. Greenpower will advise shareholders once the rig is onsite and drilling has commenced. GSM have advised that the Company’s excavator was mobilized last week and has been patching the road where necessary in order to bring the drill rig through.

    https://www.asx.com.au/asxpdf/20180320/pdf/43slcy94s9hnn9.pdf

    •12th March: Capital raised from the Placement and SPP will be used to advance the Turesi Ridge drilling campaign at the Morabisi Lithium project, ensure the existing portfolio of assets is kept in good standing and to augment working capital.

    https://www.asx.com.au/asxpdf/20180314/pdf/43sf31np2vcd8d.pdf
    Last edited by TheSower: 01/04/18
 
watchlist Created with Sketch. Add GPP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.