NST 0.81% $17.51 northern star resources ltd

Over The Limit, page-8

  1. 11,185 Posts.
    lightbulb Created with Sketch. 2609
    Yes that was a good discovery but it still fits into the realms of long term resource replacement for the Jundee mining centre, not necessarily cream off the top. You also have to ask about the costs, considering it’s not exactly connected to the existing ore body and is at depth if my meomory serves me correctly.

    I think there might be a little undisclosed geotechnical risk also connected with their 100% Kumdana mine reopening plans. Some of those projects were problematic in the past. Gold mining is never plain sailing all the time. Esh
 
watchlist Created with Sketch. Add NST (ASX) to my watchlist
(20min delay)
Last
$17.51
Change
0.140(0.81%)
Mkt cap ! $18.16B
Open High Low Value Volume
$17.48 $17.55 $17.28 $26.79M 1.534M

Buyers (Bids)

No. Vol. Price($)
1 2751 $17.50
 

Sellers (Offers)

Price($) Vol. No.
$17.52 36039 6
View Market Depth
Last trade - 16.10pm 29/11/2024 (20 minute delay) ?
NST (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.