Yes that was a good discovery but it still fits into the realms of long term resource replacement for the Jundee mining centre, not necessarily cream off the top. You also have to ask about the costs, considering it’s not exactly connected to the existing ore body and is at depth if my meomory serves me correctly.
I think there might be a little undisclosed geotechnical risk also connected with their 100% Kumdana mine reopening plans. Some of those projects were problematic in the past. Gold mining is never plain sailing all the time. Esh
- Forums
- ASX - By Stock
- NST
- Over The Limit
Over The Limit, page-8
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add NST (ASX) to my watchlist
(20min delay)
|
|||||
Last
$17.51 |
Change
0.140(0.81%) |
Mkt cap ! $18.16B |
Open | High | Low | Value | Volume |
$17.48 | $17.55 | $17.28 | $26.79M | 1.534M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2751 | $17.50 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$17.52 | 36039 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 45378 | 9.020 |
6 | 72217 | 9.010 |
4 | 47094 | 9.000 |
7 | 65586 | 8.990 |
8 | 105898 | 8.980 |
Price($) | Vol. | No. |
---|---|---|
9.040 | 46480 | 7 |
9.050 | 128028 | 11 |
9.060 | 115189 | 10 |
9.070 | 48533 | 4 |
9.080 | 64340 | 6 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
NST (ASX) Chart |