From that graph, Cobalt has been in deficit since 2013, with the deficit projected to rise each year until 2025+. Either supply has to increase very quickly (which it won't) or the price will have to rise. As a miner, you really want to be in production as soon as possible, ideally before 2020 - 2021 to maximise the cash generation of your deposit.
ALM, CLQ, CLA could all be operational by 2020 IMO?
- Forums
- ASX - By Stock
- AML
- You ain't seen nothing yet!
You ain't seen nothing yet!, page-35
-
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AML (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.482M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AML (ASX) Chart |
Day chart unavailable