SMD 0.00% 1.0¢ syndicated metals limited

Drilling Results Late?, page-4

  1. 2,659 Posts.
    lightbulb Created with Sketch. 109
    Im not sure why people believe the results to be late. It was 5-6 week drilling programme starting around the 10th Oct from memory (plus minus a day or two). Typically lab turnaround time is about 3 weeks in WA. So all good IMO.

    Waiting can be tough but rewarding.


    GL
 
watchlist Created with Sketch. Add SMD (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.