In reference to the ABC news link below, Glencore are restricting supply on zinc to keep the price high.
I'd like to think the high prices are sustainable but we shouldn't be delaying the exploitation of T1 high grade zinc. Why is there a delay with the Pre-Feasibility study? What about an update?
A low capital/ high operating margin projects like this one is rare but the the flip side is the high leverage to the zinc price.
http://www.abc.net.au/news/rural/20...ear-high-after-more-than-500-jobs-cut/9085990
- Forums
- ASX - By Stock
- PEX
- Zinc at decade high
Zinc at decade high, page-22
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PEX (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.91M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 89603 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 118500 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 15656 | 0.435 |
1 | 25000 | 0.430 |
1 | 12000 | 0.420 |
3 | 48000 | 0.415 |
2 | 100500 | 0.410 |
Price($) | Vol. | No. |
---|---|---|
0.450 | 18788 | 1 |
0.455 | 4859 | 1 |
0.460 | 12349 | 1 |
0.465 | 36629 | 2 |
0.470 | 2000 | 1 |
Last trade - 10.06am 04/12/2024 (20 minute delay) ? |
Featured News
PEX (ASX) Chart |
Day chart unavailable