    Given the decision on U3 sidetrack:

    This detailed review has confirmed the overall drilling program budgeted cost estimate of $9.5 million, but has also identified a number of potential operational complications with the originally planned sidetrack of the Ungani 3 well.

    From this detailed drilling cost and risk analysis it is apparent that drilling a new vertical well bore (Ungani 5) adjacent to the Ungani 3 well is the preferred route to test the Ungani East fault block. The reservoir intersection location for Ungani 5 is planned to be some 100 metres from the reservoir intersection in the Ungani 3 well and is more optimally located compared to the location that was planned for the sidetrack.


    considering the reduced cost do you now think it would also make sense from a technical POV to drill a new well bore adjacent to Victory, given they originally ruled out a sidetrack at the time?
    Last edited by CEOChair: 16/09/17
 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
(20min delay)
Last
4.6¢
Change
0.001(2.22%)
Mkt cap ! $54.37M
Open High Low Value Volume
4.6¢ 4.6¢ 4.6¢ $552 11.99K

Buyers (Bids)

No. Vol. Price($)
4 436878 4.5¢
 

Sellers (Offers)

Price($) Vol. No.
4.6¢ 18009 1
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
BRU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.