Good portion of the required future new supply of copper is needed to come from mega low grade deposits in difficult places. These all carry multi B dollar capex price tags to build infrastructure as well as the mine itself. Further some of these will not produce clean concentrates which add further to costs. My opinion that 300-350c/lb is not enough to gate these old zombies. Reckon plus 4 is highly likely, just timing. Add to that the electric everything boom pushing demand rates.
- Forums
- ASX - By Stock
- HCH
- Ann: New High-Grade Satellite Project Added to Productora
Ann: New High-Grade Satellite Project Added to Productora, page-7
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add HCH (ASX) to my watchlist
(20min delay)
|
|||||
Last
76.0¢ |
Change
-0.030(3.80%) |
Mkt cap ! $115.0M |
Open | High | Low | Value | Volume |
79.0¢ | 79.0¢ | 75.0¢ | $146.1K | 191.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 161 | 76.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
76.5¢ | 1607 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5873 | 0.755 |
5 | 13666 | 0.750 |
3 | 7050 | 0.740 |
1 | 300 | 0.735 |
2 | 2741 | 0.730 |
Price($) | Vol. | No. |
---|---|---|
0.770 | 11894 | 1 |
0.790 | 9410 | 2 |
0.795 | 6401 | 1 |
0.800 | 8500 | 1 |
0.805 | 3211 | 1 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
HCH (ASX) Chart |