VANESSA-1: PEL-182 COOPER BASIN S.A.
Eagle Bay Resources advises that three drill stem tests have been run across the
Epsilon and Toolachee Formations with the following results:
DST #1A Epsilon Fm 29-7 Sand Test Interval 2977.1m 2980m:
Flowing Pressure 800 PSI on ½" Choke. Estimated Final Rate - Gas at 4.4 MMscfd
Gas Composition: C1/C2/C3/C4/C5 86/11/2/1/tr Some CO2
DST #1B Epsilon Fm 29-6 Sand Test Interval 2960.2m 2693m:
No flow after 15 min. Suspected tool malfunction.
DST #1C Toolachee Fm 29-25 Sand Test Interval 2929.0m 2931.8m:
Flowing Pressure 525 PSI on ½" choke Estimated Final Rate - Gas at 2.8 MMscfd
Gas Composition: C1/C2/C3/C4/C5 77/16/5/2/tr Some CO2. Logged sand
thickness + 10 meters.
Based on these results, production casing will be run and the well suspended pending
completion as a possible gas producer at a later date.
Current operations are attempting to pull out of the hole with the test tools.
- Forums
- ASX - By Stock
- EBR
- we have gas people
we have gas people, page-2
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EBR (ASX) to my watchlist