SGL ricegrowers limited

successful well at camden gas project, page-4

Currently unlisted. Proposed listing date: MONDAY, 8 APRIL 2019 11:00AM ##
  1. 1,704 Posts.
    lightbulb Created with Sketch. 7
    now let me see, they have to frac it,
    then pump water in, then dewater and then measure the gas flow...normally take months to achieve result.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.