The opex does not compare well with peers due mostly to low grade high tonnage mine. The small line regarding pushing opex down with higher production is damaging, they are bigger than the want to be and know it.
- Forums
- ASX - By Stock
- HXG
- Ann: Pre-Feasibility Study confirms viability of McIntosh Project
Ann: Pre-Feasibility Study confirms viability of McIntosh Project, page-15
-
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add HXG (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.79M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 126427 | 2.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 213000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.024 |
2 | 386221 | 0.023 |
2 | 147000 | 0.022 |
5 | 1217500 | 0.020 |
2 | 54368 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.025 | 498695 | 1 |
0.026 | 289259 | 4 |
0.027 | 396549 | 3 |
0.028 | 281127 | 2 |
0.029 | 50000 | 1 |
Last trade - 16.12pm 29/11/2024 (20 minute delay) ? |
HXG (ASX) Chart |
Day chart unavailable