Notice we now have a new executive position being Dave McGowan as Manager Engineering. He was previously with Resolute mining and Barrick.
Looks to me like E15 Shaft won't be finished before December so first half production for FY18 won't exceed 60,000 ozs with 80,000 ozs possible in second half.