As per NST quarterly
Hermes
The Resource development and sterilisation drilling program at the Hermes Project was completed during the quarter as part of the feasibility study for the proposed development. The program was extended to approximately 33,000m of RC drilling following excellent results (with visible gold) from extensional drilling in the Winchester area and the discovery of new mineralisation (with visible gold) under a proposed waste dump site in the Blake area. An updated Resource model is in preparation prior to new optimisation studies and detailed mine planning along with the finalisation of infrastructure sites and access corridors.
- Forums
- ASX - By Stock
- ALY
- NST No.1 holder (In a micro)?
NST No.1 holder (In a micro)?, page-150
-
-
- There are more pages in this discussion • 134 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ALY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.068M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 10459854 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 766366 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 204000 | 0.013 |
6 | 1534407 | 0.012 |
3 | 1018000 | 0.011 |
4 | 1300000 | 0.010 |
1 | 100000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 431766 | 2 |
0.015 | 328000 | 2 |
0.016 | 492086 | 4 |
0.017 | 401126 | 3 |
0.019 | 196092 | 2 |
Last trade - 16.12pm 22/11/2024 (20 minute delay) ? |
ALY (ASX) Chart |
Day chart unavailable