PLN (Perusda- State Electricity Company) still stating that LNG gas sales from EWC Sengkang to Bali Power Plant will have priority over other Wajo areas for their gas.
PLN will be looking for as much of EWC's LNG as they can get. Hoping there is enough gas left for Philippines hub.
Below is PLN article re Wajo pipe line and gas distribution.
Perusda South Sulawesi
Sales of Natural Gas New Sengkang be realized Semester II / 2015
Amri Nur Rahmat - August 15, 2014, 17:06 pm
Illustration
Bisnis.com, MAKASSAR - Sulawesi Perusda predicted sales of natural gas processing new Sengkang be realized in the second half of next year.
These estimates because the processing infrastructure construction and development of natural gas pipelines are still in the 70% rate.
Director Perusda Sulael Harris Hody said initial sales of natural gas processing Wajo results will be distributed to the needs of the power plant in Bali as much as 25 MMSCFD.
Perusda originally predicted sales of natural gas Wajo can begin commercially in the third quarter of this year.
"Sales can only be done in the second half of next year. The infrastructure has been 70%. Balinese power plant will be our first LNG supply his needs," he told Business on the sidelines of Musda Chamber of Commerce of South Sulawesi, on Friday (15/08/2014).
Meanwhile, processing of natural gas into LNG Sengkang joint operation done by Perusda Sulawesi, Wajo enterprises, PT Energy Sengkang and PT Prodigy Equity Energy Resources.
Meanwhile, for the transportation of liquefied natural gas transportation (LNG), Perusda has worked with multinational companies GO LNG from Norway.
Harris explained, the position of the company on the business as atrader is responsible for the entire process of marketing and distribution of natural gas processing Wajo.
"The investment value of the overall project is to reach $ 500 million sourced from our partners," he said.
Meanwhile, natural gas has the potential Wajo up to 70 million metric British thermal units (MMBTU) which is able to build a power plantpowerful 2 x 350 MW.
According to Harris, if the whole infrastructure has been completed, distribution of LNG in Wajo expected to reach 70 MMSCFD per day in order to supply the demand for the electricity sector.
- Forums
- ASX - By Stock
- EWC
- Sengkang gas supply
Sengkang gas supply
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.9¢ |
Change
-0.001(5.00%) |
Mkt cap ! $29.24M |
Open | High | Low | Value | Volume |
2.1¢ | 2.2¢ | 1.8¢ | $46.85K | 2.335M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 603480 | 1.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.0¢ | 1849678 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 97 | 0.095 |
3 | 311964 | 0.094 |
1 | 300000 | 0.093 |
1 | 25000 | 0.092 |
3 | 54000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.096 | 20355 | 1 |
0.097 | 3101 | 1 |
0.099 | 60000 | 1 |
0.100 | 71326 | 2 |
0.105 | 220678 | 4 |
Last trade - 14.28pm 02/12/2024 (20 minute delay) ? |
Featured News
EWC (ASX) Chart |