J - thanks, great stuff.
To the point, accessible, brief and well structured 10/10!
When you go back over years of these anns you continually pick up insights.
For example, the complete lack of proppant being recovered might also indicate greater capacity of the fracced rock to accommodate more proppant in the next well design, to be even more effective in keeping fraccs open and flow more freely.
I also noticed in a previous ann from late 2012 early '13 that the original plans for 77H involved locating it's lateral abutting 76H intentionally try to interconnect and feed in to 77H. If they have succeeded in this it may well have fracced into substantial abutting common rock formations and taken up every last bit of proppant, hence none showing up in flow back. Also, if they have succeeded, 77H may be a real bonanza result.
I'll dig out the floor plan for the 76H pad, 6 well layout - very interesting config and I expect it will now be implemented with the remaining 4 wells.