For those in a hurry,
Things are starting to happen,
Glad to read the additional comment,while they have the equipment onsite and the GIN GIN well is shutdown ,they will take the opportunity to collect down well Data from that as well.
Hopefully as a precursor to perforating other structures identified within that well and increasing total gas flow from that well too..
If nothing more it will help work out appropriate draw down rates from both D sands and what extra resource gas flow is needed for The RG plant.
We might even see the condensate on pump to reduce down hole back pressure to help up gas flows yet.(as they do with water laden gas reservoirs)
Or maybe with a bit of wishful thinking,the gas flow is so great from RG1,they can gain accelerated approval to perforate Gin Gin straight after testing is completed on RG1,while the plant is still onsite as well.
DYOR+DYODD
- Forums
- ASX - By Stock
- EGO
- Ann: Red Gully-1 B Sands perforation and well tests underway
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)