Hard to say GC but they have contracted the rig for 6 weeks. PNOC have stated drilling to take 20 days but I think the target is at about 3000mtrs so I'd expect a bit longer than that. It's a shame we seem to have lost the knowledge and quality of a couple of posters, one has vanished ,strats and the other niu I think is still on the drink.
- Forums
- ASX - By Stock
- NDO
- extra 10% of barra
extra 10% of barra, page-63
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist