re: oops ...... preopen Sorry wrong day....oops
here is todays..
ACN 051 212 429
First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322
PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330
th
Date: 17 January 2006
To: Companies Announcements Office, ASX
Electronic Lodgement:
Number of pages: 2
ANNOUNCEMENT TO ASX
DRILLING RELEASE 7: EMILY#1
PEL-182, COOPER / EROMANGA BASIN S.A.
Eagle Bay Resources advises that the Emily-1 oil and gas exploration well is drilling ahead in the Upper
Tinchoo Formation in 8 ½” hole. No significant shows were recorded from the Poolowanna Formation (the
second main objective) or the top of the Tinchoo Formation. Both these zones will be further evaluated by
wireline logs.
th
The status of Emily-1 at 06:00 hrs (CST) on 17 January 2006 was:
Location: PEL-182
Planned Total Depth: 2364 metres (TVD)
Current Depth: 2186 metres – in Tinchoo Fm.
Operation: Drilling ahead in 8 ½” hole.
th
Spudded: 23:00 hrs 7 January 2006
Participants in the Emily-1 well are:
Eagle Bay Resources (Operator) 37.6%
Audax Resources Ltd 39.9%
White Sands Petroleum Ltd 10.0%
Australian Oil Company No2 P/L 12.5%
Rig: Century Rig-18
Target Strata: Hutton SS
Poolowanna SS
Tinchoo SS
Yours sincerely
________________
TONY RECHNER
DIRECTOR
- Forums
- ASX - By Stock
- EBR
- eagle bay chairman on asic charges!
eagle bay chairman on asic charges!, page-8
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EBR (ASX) to my watchlist