Things are a bit quiet heading into the break, so I did up a progress chart for Matuku...
Note that the last segment of the drill line is projected to the TD at spud +45d
The last section of hole/casing may include another step, we only know the 12.25/9.875 section is expected to go to 3407m, and an 8" hole (presume 7" casing from other drilling reports) will go from there. Maybe just a 6" hole into the regions of interest.
Does anyone know the depth of the target zones?
- Forums
- ASX - By Stock
- ECH
- Ann: Matuku-1 Weekly Progress Report No. 2
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)