Bhutos,
Enerdrill are still contracted to drill 3 wells (Incl Condon and the 2 Canning wells) in WA in 2014. ... If they did not want to drill the Canning in 2014 they would have simply cancel the contract... But they haven't cancelled it... So To all intents its still on IMO.
So for 6 months drilling delay in WA they will likely have 6 producing wells in the Eagle ford area... That's a pretty fair tradeoff IMHO
- Forums
- ASX - By Stock
- AQO
- Ann: Transforming New Standard Energy
-
- There are more pages in this discussion • 158 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)