KEY 0.00% 0.1¢ key petroleum limited

anyone out there, page-2

  1. 6,736 Posts.
    lightbulb Created with Sketch. 122
    Given the delays with drilling are due to awaiting DMP approval to start then I can't see us losing the permit. DMP will presumably grant an extension of time.
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $2.262M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0
KEY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.