A nice bit of "consulting" and then never heard of again.
Putting aside the supposed off take with Noble for lump ore.
To set up a mine 26km in country and then come out and say you are thinking about building a Smelter as well, seems right out there. NOBLES $10m wont cover that.
Below is a link to Zamanco Minerals. (ZAM)
They are in Zambia. There have Mg mining planned. They have a drill program.....no...a real one. And..plans for a smelter. (Near Mansa) And god forbid, a planned BFS for all of it.
The first thing you will notice is their planned site for a smelter is next to a transformer sub station. Not 26km from no where and from a power source needing transmission lines into site.
The next, and what I have been saying, is the estimated Capex for.